Uploaded image for project: 'Sakai'
  1. Sakai
  2. SAK-25303

Links in schedule and calendar widget to a 'not open' assignment throws an error in the UI

    Details

    • 2.9 Status:
      Resolved

      Description

      When an assignment is created with the option 'Add due date to schedule' marked. A link to the assignment is added to the schedule tool. While the assignment is not open (not displayed in assignements tool yet), if a student goes to schedule and clicks on the link, it will get an Error on the UI.

      The link should not be active until the assigment is open.

      I believe that in olders versions of Sakai, an assignment was listed to students whether it was open or not. Now, an assignment is only visible to students if it is open, otherwise, they will not see the assignment.

      CLE team thinks this was caused by the SAK-11160 changes - 'Assignments which have not been released to students (as set by the dates in Assignments) are visible and clickable in the Calendar'

        Gliffy Diagrams

          Zeplin

            Attachments

              Issue Links

                Activity

                  People

                  Assignee:
                  bkirschn Beth Kirschner
                  Reporter:
                  jmariano Jose Mariano Lujan
                  Votes:
                  3 Vote for this issue
                  Watchers:
                  11 Start watching this issue

                    Dates

                    Created:
                    Updated:
                    Resolved:

                      Git Integration