Uploaded image for project: 'Sakai'
  1. Sakai
  2. SAK-25520

Assignment content not yet released to Students is viewable in Calendar summary tool based on Due Date set in the assessment

    Details

      Description

      When creating an assessment in the Assignment tool with an open date set in the future, If you select "Add due date to Schedule",
      the assignment is viewable in the Calendar summary tool on the close date of the assignment - when viewing the Calendar summary tool from the course home page.
      The assignment can be accessed by a student viewing the Calendar summary tool even though the assignment is not open to students as per the due date set in the assignment.
      Attachments can be accessed and downloaded by the student in the Calendar summary tool entry for the assignment.
      This issue related to https://jira.sakaiproject.org/browse/SAK-25303

        Gliffy Diagrams

          Zeplin

            Attachments

              Issue Links

                Activity

                  People

                  Assignee:
                  bkirschn Beth Kirschner
                  Reporter:
                  chaitanya.cheekate Kumar Ch
                  Votes:
                  0 Vote for this issue
                  Watchers:
                  4 Start watching this issue

                    Dates

                    Created:
                    Updated:
                    Resolved:

                      Git Integration