Uploaded image for project: 'Sakai'
  1. Sakai
  2. SAK-30547

Worksite setup - Morpheus issues from Test Fests

    XMLWordPrintable

    Details

      Description

      The QA Team identified the following UI bugs in this tool:

      https://docs.google.com/document/d/1lRzH_1NWwNrPBGKfCOEO2uDSVp1AObgdRnqKT9WTaUY/edit

      This is a parent JIRA to track all morpheus-related issues for this tool. Do not submit a PR against this JIRA. Instead:

      • Create a linked JIRA for the fixes you make to the tool based on the google doc above.
      • In the linked JIRA(s) you create, identify which issues you've fixed using the Issue ID # in the google doc above. e.g.,"Worksite Setup-21"

        Gliffy Diagrams

          Zeplin

            Attachments

              Issue Links

                Activity

                  People

                  • Assignee:
                    Unassigned
                    Reporter:
                    jmariano Jose Mariano Lujan
                  • Votes:
                    0 Vote for this issue
                    Watchers:
                    1 Start watching this issue

                    Dates

                    • Created:
                      Updated:

                      Time Tracking

                      Estimated:
                      Original Estimate - Not Specified
                      Not Specified
                      Remaining:
                      Remaining Estimate - 0 minutes
                      0m
                      Logged:
                      Time Spent - 3 hours, 55 minutes
                      3h 55m

                        Git Integration